Strong and weak electricity engineering is one of the main laboratory in decoration engineering,because
it's relationship with the normal work of the whole company, so also
cannot ignore. First or to find a qualified professional integrated
wiring, conducted by professional and technical personnel to the site
actual measurements, the strong and weak electricity reserve switches,
sockets and a variety of lines on the drawings to reflect all planning,
property company, and then to the audit is required to achieve their
office building decoration company regulation standard, such as: wire
must wear tube, pipe, electrical system arrangement of what is compound
the output system and so on, they set aside as required by the customer
demand and their requirements, so before the audit report to property,
customer need to review, main is to see whether the use of to satisfy
his needs.
Most of the decoration in lab to do partition, if the
partition to the top, do smoke and spray changes, and many property
company usually put the hot potato to owner or decoration company to
solve on their own, so will be looking for those who have the
qualification of the fire, the fire company and approval in accordance
with the relevant provisions for approval by the local fire department
this time is usually 10 ~ 15 days.
In the lab is also need to divide the space partition
in the decoration, it will have to consider every space to keep a
certain number of central air-conditioning outlet and inlet, so also
need to find a formal qualifications of central air-conditioning
installation company. Decoration in the laboratory to transform the
central air conditioning must be before layout to property company
audit. After the completion of the engineering property company also
asked to show a central air conditioning project completion.
Office furniture decoration design in the laboratory
before you find a good decorate a company or a furniture company,
because most of the office needs to be high office partition, a lot of
lines, the socket is connected to partition, so furniture company must
with electrical engineers have a strong cohesion, drawing the best first
after the determined jointly by the two parties, to get the property
company audit, they can rest assured starts after approval.